United States › Grid › Interconnection queues › Montana
SOLAR + STORAGE · WESTSolar + storage project 412, Gallatin County
Solar + storage project 412, Gallatin County is a 80.0 MW solar + storage request suspended in the West interconnection queue, in Gallatin County, Montana, connecting to NorthWestern Energy.
Queue statusPaused / redesign
- PlanningQueued Jun 2021 (current stage)
- Consented (not yet reached)
- Construction (not yet reached)
- Operating (not yet reached)
- Closed (not yet reached)
Studies assess what grid upgrades the project would need and who pays for them. A signed interconnection agreement is the main step before construction.
Request details
- Queue ID
- 412
- Grid region
- West (non-ISO utilities)
- Utility / transmission owner
- NorthWestern Energy
- Connection point (POI)
- Three Rivers 161kV Substation
- Location
- Gallatin County, Montana
- Technology
- Solar: 80.0 MW · Battery
- Total requested
- 80.0 MW
- Service type
- Network resource (NRIS)
- Study phase
- Feasibility Study 8/16/2021 System Impact Study 12/29/2021 Facilities Study 8/24/2022 Facilities Re-Study 4/21/2023
- Queue status
- Suspended
- Entered queue
- 1 June 2021
Location
Marker shows the centre of Gallatin County; the queue data does not give exact sites.
Other requests in Gallatin County
- Solar project 454, Gallatin CountySolar · 2.0 MW · in study
- Solar project 444, Gallatin CountySolar · 2.0 MW · built
- Solar project 298, Gallatin CountySolar · 0.3 MW · built
- Hydro project 116, Gallatin CountyHydro · 0.2 MW · built
- Battery storage project 382, Gallatin CountyBattery storage · 30.0 MW · withdrawn
- Battery storage project 386, Gallatin CountyBattery storage · 30.0 MW · withdrawn
- Solar project 240, Gallatin CountySolar · 3.0 MW · withdrawn
- Solar project 306, Gallatin CountySolar · 3.0 MW · withdrawn
- Solar project 294, Gallatin CountySolar · 3.0 MW · withdrawn
- Battery storage project 28, Gallatin CountyBattery storage · 0.5 MW · withdrawn
- Solar project 280, Gallatin CountySolar · 0.3 MW · withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem