Battery storage project 28, Gallatin County

Battery storage project 28, Gallatin County is a 0.5 MW battery storage request withdrawn in the West interconnection queue, in Gallatin County, Montana, connecting to NorthWestern Energy.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Apr 2003 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
28
Grid region
West (non-ISO utilities)
Utility / transmission owner
NorthWestern Energy
Connection point (POI)
Jack Rabbit Substation Distribution
Location
Gallatin County, Montana
Technology
Other Storage: 0.5 MW
Total requested
0.5 MW
Service type
Energy only (ERIS)
Queue status
Withdrawn
Entered queue
4 April 2003

Location

Marker shows the centre of Gallatin County; the queue data does not give exact sites.

Power plants in Montana Β· Transmission lines in Montana

Other requests in Gallatin County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem