United States βΊ Grid βΊ Interconnection queues βΊ Montana
SOLAR Β· WESTSolar project 280, Gallatin County
Solar project 280, Gallatin County is a 0.3 MW solar request withdrawn in the West interconnection queue, in Gallatin County, Montana, connecting to NorthWestern Energy.
Queue statusWithdrawn / abandoned
- PlanningQueued May 2016 (completed)
- Withdrawn / abandoned (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 280
- Grid region
- West (non-ISO utilities)
- Utility / transmission owner
- NorthWestern Energy
- Connection point (POI)
- Westside Substation, Bozeman, MT
- Location
- Gallatin County, Montana
- Technology
- Solar: 0.3 MW
- Total requested
- 0.3 MW
- Service type
- Energy only (ERIS)
- Queue status
- Withdrawn
- Entered queue
- 18 May 2016
- Proposed online date
- June 2016
Location
Marker shows the centre of Gallatin County; the queue data does not give exact sites.
Other requests in Gallatin County
- Solar project 454, Gallatin CountySolar Β· 2.0 MW Β· in study
- Solar + storage project 412, Gallatin CountySolar + storage Β· 80.0 MW Β· suspended
- Solar project 444, Gallatin CountySolar Β· 2.0 MW Β· built
- Solar project 298, Gallatin CountySolar Β· 0.3 MW Β· built
- Hydro project 116, Gallatin CountyHydro Β· 0.2 MW Β· built
- Battery storage project 382, Gallatin CountyBattery storage Β· 30.0 MW Β· withdrawn
- Battery storage project 386, Gallatin CountyBattery storage Β· 30.0 MW Β· withdrawn
- Solar project 240, Gallatin CountySolar Β· 3.0 MW Β· withdrawn
- Solar project 306, Gallatin CountySolar Β· 3.0 MW Β· withdrawn
- Solar project 294, Gallatin CountySolar Β· 3.0 MW Β· withdrawn
- Battery storage project 28, Gallatin CountyBattery storage Β· 0.5 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem