United States › Grid › Interconnection queues › Montana
SOLAR · WESTSolar project 444, Gallatin County
Solar project 444, Gallatin County is a 2.0 MW solar request built and operating in the West interconnection queue, in Gallatin County, Montana, connecting to NorthWestern Energy.
Request details
- Queue ID
- 444
- Grid region
- West (non-ISO utilities)
- Utility / transmission owner
- NorthWestern Energy
- Connection point (POI)
- Three Forks, MT
- Location
- Gallatin County, Montana
- Technology
- Solar: 2.0 MW
- Total requested
- 2.0 MW
- Service type
- Network resource (NRIS)
- Study phase
- Feasibility Study 9/1/2023 Feasibility Study V2 9/8/2023
- Queue status
- Operational
- Entered queue
- 7 July 2023
- Proposed online date
- January 2024
- Came online
- January 2024
Location
Marker shows the centre of Gallatin County; the queue data does not give exact sites.
Other requests in Gallatin County
- Solar project 454, Gallatin CountySolar · 2.0 MW · in study
- Solar + storage project 412, Gallatin CountySolar + storage · 80.0 MW · suspended
- Solar project 298, Gallatin CountySolar · 0.3 MW · built
- Hydro project 116, Gallatin CountyHydro · 0.2 MW · built
- Battery storage project 382, Gallatin CountyBattery storage · 30.0 MW · withdrawn
- Battery storage project 386, Gallatin CountyBattery storage · 30.0 MW · withdrawn
- Solar project 240, Gallatin CountySolar · 3.0 MW · withdrawn
- Solar project 306, Gallatin CountySolar · 3.0 MW · withdrawn
- Solar project 294, Gallatin CountySolar · 3.0 MW · withdrawn
- Battery storage project 28, Gallatin CountyBattery storage · 0.5 MW · withdrawn
- Solar project 280, Gallatin CountySolar · 0.3 MW · withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem