Solar project 240, Gallatin County

Solar project 240, Gallatin County is a 3.0 MW solar request withdrawn in the West interconnection queue, in Gallatin County, Montana, connecting to NorthWestern Energy.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Dec 2015 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
240
Grid region
West (non-ISO utilities)
Utility / transmission owner
NorthWestern Energy
Connection point (POI)
Riverside Substation, Bozeman, MT
Location
Gallatin County, Montana
Technology
Solar: 3.0 MW
Total requested
3.0 MW
Service type
Energy only (ERIS)
Study phase
System Impact Study
Queue status
Withdrawn
Entered queue
29 December 2015
Proposed online date
December 2016

Location

Marker shows the centre of Gallatin County; the queue data does not give exact sites.

Power plants in Montana Β· Transmission lines in Montana

Other requests in Gallatin County