ONSHORE WIND · NYISOHoffman Falls Wind
Hoffman Falls Wind is a 72.0 MW onshore wind request in interconnection study in the NYISO interconnection queue, in Madison County, New York, connecting to NM-NG.
Queue statusIn planning
- PlanningQueued Jan 2021 (current stage)
- Consented (not yet reached)
- Construction (not yet reached)
- OperatingTarget Dec 2027 (not yet reached)
- Closed (not yet reached)
Studies assess what grid upgrades the project would need and who pays for them. A signed interconnection agreement is the main step before construction.
Request details
- Queue ID
- 1130
- Grid region
- NYISO (New York)
- Utility / transmission owner
- NM-NG
- Developer
- Hoffman Falls Wind LLC
- Connection point (POI)
- Cortland - Fenner 115kV Line #3
- Location
- Madison County, New York
- Technology
- Wind: 72.0 MW
- Total requested
- 72.0 MW
- Study phase
- FS
- Queue status
- Active
- Entered queue
- 27 January 2021
- Proposed online date
- December 2027
Location
Marker shows the centre of Madison County; the queue data does not give exact sites.
Other requests in Madison County
- Oxbow Hill SolarSolar · 140 MW · in study
- Hoffman Falls Wind 2Onshore wind · 29.8 MW · in study
- Munnsville - Phase 1Onshore wind · 34.5 MW · built
- Fenner Wind Energy Fac.Onshore wind · 30.0 MW · built
- Fenner Wind Energy Fac.Onshore wind · 30.0 MW · built
- Ditch Creek SolarSolar + storage · 200 MW · withdrawn
- Ditch CreekSolar + storage · 200 MW · withdrawn
- Hoffman Falls Wind 2Onshore wind · 103 MW · withdrawn
- Cazenovia SolarSolar · 80.0 MW · withdrawn
- Rolling Upland Wind FarmOnshore wind · 79.8 MW · withdrawn
- Rolling Upland Wind Farm LLCOnshore wind · 79.8 MW · withdrawn
- Stockbridge WindOnshore wind · 72.6 MW · withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem