NESO TEC REGISTER · GREAT BRITAIN

Grid connection projects in the connection queue on the SP Transmission (south Scotland) network

Every generator, battery and interconnector with an agreement to connect to the GB transmission network, from early scoping to built. Filter by technology, stage or network, and open a project for its connection details.

Projects shown31969.7 GW in total
In planning319scoping or awaiting consent
Consented or building64closest to connecting
Built84connected and operating

Map

Loading projects…

Voltage400 kV275 kV132 kVHVDCNew HVAC

ProjectsPlanningConsentedConstructionBuiltMajor project with its own page

Projects

319 projects · page 5 of 7
ProjectCapacityStageConnection siteFrom
Assel Valley Extension Wind Farm
Wind + storage · Renantis UK Limited
88 MWScoping Maybole GSP
SP Transmission (south Scotland)
Oct 2032
West Andershaw Wind Farm
Onshore wind · West Andershaw Wind Farm Limited
86 MWScoping West Andershaw 132kV Substation
SP Transmission (south Scotland)
Apr 2030
Carrick Wind Farm
Onshore wind · Scottish Power Renewables (UK) Limited
84 MWAwaiting Consents Carrick Wind Farm Substation
SP Transmission (south Scotland)
Apr 2030
Hagshaw Repowering Phase 3
Solar + storage · Hagshaw Repowering 2 Ltd
84 MWScoping Hagshaw Repowering Phase 3 132kV
SP Transmission (south Scotland)
Apr 2029
Minnygryle Burn Energy Park
Wind + storage · Wind 2 Project 6 Limited
84 MWScoping Minnygryle Burn Energy Park 132kV substation
SP Transmission (south Scotland)
Oct 2036
Harestanes West Wind Farm
Onshore wind · Scottish Power Renewables (UK) Limited
81 MWScoping Harestanes West Wind Farm 132/33kV
SP Transmission (south Scotland)
Jul 2035
Airds Hill Wind Farm
Wind + storage · Onpath Energy Limited
80 MWScoping Airds Hill WindFarm 132kV Substation
SP Transmission (south Scotland)
May 2031
Breezy Hill Wind Farm
Onshore wind · Brockwell Energy Limited
80 MWScoping New Cumnock A 132kV
SP Transmission (south Scotland)
Apr 2028
Chesters
Wind + storage · Queequeg Renewables Ltd
80 MWScoping Teviot 400/132kV Substation
SP Transmission (south Scotland)
Oct 2033
Glenmuir Windfarm
Onshore wind · Brockwell Energy Limited
80 MWScoping Glenmuir Windfarm 132kV Substation
SP Transmission (south Scotland)
Jun 2036
Heathland Wind Farm
Wind + storage · Edf Energy Renewables Limited
80 MWScoping Heathland 132/33kV Substation
SP Transmission (south Scotland)
Sep 2028
Upper Beoch Windfarm
Onshore wind · Brockwell Energy Limited
80 MWScoping New Cumnock North 132kV Substation
SP Transmission (south Scotland)
Jul 2036
Olivers Forest Wind Farm
Onshore wind · Oliver Forest Wind Farm Limited
79 MWAwaiting Consents Olivers Forest Wind Farm 132kV Substation
SP Transmission (south Scotland)
Apr 2031
Bankend Rig III Wind Farm
Onshore wind · Wilson Renewables III LLP
78 MWScoping Bankend Rig III 132kV Collector Substation
SP Transmission (south Scotland)
Apr 2030
Craighead Wind Farm
Onshore wind · Galileo 02 Limited
77 MWScoping CRAIGHEAD WIND FARM 132kV SUBSTATION
SP Transmission (south Scotland)
Oct 2032
Chalmerston Windfarm
Onshore wind · Brockwell Energy Limited
75 MWScoping CHALMERSTON WINDFARM 132kV SUBSTATION
SP Transmission (south Scotland)
Oct 2037
Windburn Wind Farm
Wind + storage · Windburn Wind Farm Limited
75 MWScoping Devonside 132kV Substation
SP Transmission (south Scotland)
Oct 2034
Arecleoch Extension Windfarm
Onshore wind · Scottish Power Renewables (UK) Limited
73 MWScoping Arecleoch 132/33kV
SP Transmission (south Scotland)
Aug 2026
Killeal
Onshore wind · Abei Energy Limited
73 MWScoping Newton Stewart GSP
SP Transmission (south Scotland)
Oct 2036
Leithenwater Wind Farm
Wind + storage · Leithenwater Wind Energy Hub Limited
73 MWScoping Galashiels 132/33kV
SP Transmission (south Scotland)
Apr 2030
Vale of Leven Wind Farm
Onshore wind · Vale of Leven Wind Farm Limited
72 MWScoping Vale of Leven 132kV substation
SP Transmission (south Scotland)
Oct 2033
Hunterston Wind Farm
Wind + storage · Galileo 01 Limited
70 MWScoping Hunterston 400/132kV
SP Transmission (south Scotland)
Apr 2033
Tinnisburn Wind Farm
Wind + storage · Baywa R.e. UK Limited
70 MWScoping Tinnisburn Wind Farm 132Kv Substation
SP Transmission (south Scotland)
Oct 2031
Lorg Wind Farm
Onshore wind · RWE Renewables UK Onshore Wind Limited
70 MWAwaiting Consents Lorg Wind Farm 132/32kV
SP Transmission (south Scotland)
Apr 2028
Troston Wind Farm
Onshore wind · Troston Windfarm Limited
68 MWAwaiting Consents Margree 132/33kV Collector Substation
SP Transmission (south Scotland)
Oct 2029
Cloich Forest Wind Farm
Onshore wind · Edf Energy Renewables Limited
67 MWScoping Cloich 132kV Substation
SP Transmission (south Scotland)
Jul 2029
Greystone Knowe Windfarm
Wind + storage · Greystone Knowe Windfarm Limited
67 MWScoping Gala North 132Kv Substation
SP Transmission (south Scotland)
Oct 2033
Appin Wind Farm
Onshore wind · Appin Wind Farm Limited
66 MWScoping Appin Wind Farm 132kV Substation
SP Transmission (south Scotland)
Oct 2031
Hoolan Hills Renewable Energy Park
Onshore wind · Ridge Clean Energy Ltd
66 MWScoping Holm Hill 132kV Substation
SP Transmission (south Scotland)
Oct 2037
Wether Hill
Onshore wind · Scottish Power Renewables (UK) Limited
66 MWScoping Wether Hill 132/33KV Substation
SP Transmission (south Scotland)
Sep 2031
Scawd Law Wind Farm
Wind + storage · Fred Olsen Renewables Limited
64 MWScoping Gala North 400/132kV Substation
SP Transmission (south Scotland)
Apr 2032
AGS Calderside PV Solar
Solar · Advance Grid Solutions Limited
63 MWScoping Clydesmill 275/33kV
SP Transmission (south Scotland)
May 2027
Divot Hill Wind Farm
Wind + storage · Energyfarm Divot Hill Ltd
63 MWScoping Divot Hill 132/33 kV Substation
SP Transmission (south Scotland)
Oct 2036
South Street BESS
Battery storage · South Street BESS Limited
63 MWScoping Partrick GSP
SP Transmission (south Scotland)
Jun 2031
AGS Coatbridge
Battery storage · Advance Grid Solutions Limited
60 MWScoping Coatbridge GSP
SP Transmission (south Scotland)
Apr 2033
Cloud Hill Windfarm
Wind + storage · Cloud Hill Windfarm Limited
60 MWScoping Glenglass 132/33kV
SP Transmission (south Scotland)
Oct 2036
D&G 2
Onshore wind · Greyland Energy Park Limited
60 MWScoping Ladyburn 132/33Kv Grid Supply Point Substation
SP Transmission (south Scotland)
Aug 2031
Galileo 10
Battery storage · Galileo 10 Limited
60 MWScoping Armadale 132kV Substation
SP Transmission (south Scotland)
Oct 2031
Knockkippen Energy Park
Solar + storage · Knockkippen Wind Energy Limited
60 MWScoping Ayr GSP
SP Transmission (south Scotland)
Aug 2028
Longriggs Energy Park
Battery storage · Brockwell Storage & Solar Limited
60 MWAwaiting Consents Devonside 132/33kV
SP Transmission (south Scotland)
Apr 2039
Outh Muir Energy Park
Solar + storage · Grupotec Solar UK 4 Ltd
60 MWScoping Dunfermline 132/33kV
SP Transmission (south Scotland)
Apr 2028
Penninghame Wind Farm
Onshore wind · Edf Energy Renewables Limited
60 MWScoping Penninghame Substation
SP Transmission (south Scotland)
Oct 2031
Scaw Law Wind Farm
Wind + storage · Perigus Energy UK Limited
60 MWScoping Scaw Law 132kV substation
SP Transmission (south Scotland)
Oct 2036
Scottish Water Bonnybridge STW 60MW BESS
Battery storage · Bluestone Energy Ltd
60 MWScoping Bonnybridge 132/33kV
SP Transmission (south Scotland)
Oct 2030
Scottish Water Linwood STW 60MW BESS
Battery storage · Bluestone Linwood 1 Ltd
60 MWScoping Jonhstone 132/33kV Substation
SP Transmission (south Scotland)
Jun 2028
Sec 1 BESS
Battery storage · Bluestone Energy Ltd
60 MWScoping Finnieston GSP
SP Transmission (south Scotland)
Jul 2031
Stanley Water WTW BESS
Battery storage · Bluestone Energy Ltd
60 MWScoping Paisley GSP
SP Transmission (south Scotland)
Oct 2028
Touch Energy Park
Wind + storage · Naturalis Energy Developments Ltd
60 MWScoping Stirling 132/33kV
SP Transmission (south Scotland)
Jan 2029
Whitehill 60MW BESS
Battery storage · GPC 013 LTD
60 MWScoping Drumchapel 275/33kV
SP Transmission (south Scotland)
Oct 2028
Knockcronal Wind Farm
Onshore wind · Knockcronal Wind Farm Limited
59 MWAwaiting Consents Knockcronal Wind Farm 33kV Substation
SP Transmission (south Scotland)
Oct 2029

Sources: NESO Transmission Entry Capacity (TEC) register and interconnector register (downloaded 8 November 2026); NESO Clean Power 2030 network map (existing and planned circuits, substations and network projects); National Grid Electricity Transmission overhead line routes. Contains data from NESO, licensed under the NESO Open Data Licence, and National Grid open data. Projects are placed at their connection substation, not the generating site; projects at new, unnamed “connection nodes” are listed but not mapped.