Grid infrastructure › Connection queue › Onshore wind
ONSHORE WIND · SPTWest Andershaw Wind Farm
West Andershaw Wind Farm is a 86 MW onshore wind project in planning, connecting to the SP Transmission (south Scotland) network at West Andershaw 132kV Substation, with capacity due from April 2030. The connection agreement is held by West Andershaw Wind Farm Limited.
- Planning (current stage)
- Consented (not yet reached)
- Construction (not yet reached)
- OperatingFrom Apr 2030 (not yet reached)
- Closed (not yet reached)
Scoping and awaiting consents are both shown as planning. A connection agreement does not mean the project will be built: many queue projects never reach construction.
Connection details
- NESO project number
- PRO-002584
- Customer
- West Andershaw Wind Farm Limited
- Technology
- Wind Onshore
- Total capacity
- 86 MW
- Change in this agreement
- +86 MW
- Capacity effective from
- 30 April 2030
- Connection site
- West Andershaw 132kV Substation
- Transmission owner
- SP Transmission (south Scotland)
- Connection type
- Direct connection to the transmission network
- NESO project status
- Scoping
- Connections reform gate
- Gate 1
Connection site
The connection site could not be placed on the map.
Source: NESO Transmission Entry Capacity (TEC) register, downloaded 8 November 2026. Contains data from NESO, licensed under the NESO Open Data Licence. Report a problem