πŸ”Œ EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more β†’ Skip to main content

Grid infrastructure β€Ί Connection queue β€Ί Wind + storage

WIND + STORAGE Β· SPT

Hunterston Wind Farm

Hunterston Wind Farm is a 70 MW wind + storage project in planning, connecting to the SP Transmission (south Scotland) network at Hunterston 400/132kV, with capacity due from April 2033. The connection agreement is held by Galileo 01 Limited.

Project stageIn planning
  1. Planning (current stage)
  2. Consented (not yet reached)
  3. Construction (not yet reached)
  4. OperatingFrom Apr 2033 (not yet reached)
  5. Closed (not yet reached)

Scoping and awaiting consents are both shown as planning. A connection agreement does not mean the project will be built: many queue projects never reach construction.

Connection details

NESO project number
PRO-003165
Customer
Galileo 01 Limited
Technology
Energy Storage System, Wind Onshore
Total capacity
70 MW
Change in this agreement
+70 MW
Capacity effective from
30 April 2033
Connection site
Hunterston 400/132kV
Transmission owner
SP Transmission (south Scotland)
Connection type
Direct connection to the transmission network
NESO project status
Scoping
Connections reform gate
Gate 1

Connection site

The marker shows the connection substation, not the project itself, with the transmission network around it.

Projects connecting near Hunterston Β· Grid map

Other projects at Hunterston 400/132kV

Source: NESO Transmission Entry Capacity (TEC) register, downloaded 8 November 2026. Contains data from NESO, licensed under the NESO Open Data Licence. Report a problem