Grid infrastructure › Connection queue › Onshore wind
ONSHORE WIND · SPTHoolan Hills Renewable Energy Park
Hoolan Hills Renewable Energy Park is a 66 MW onshore wind project in planning, connecting to the SP Transmission (south Scotland) network at Holm Hill 132kV Substation, with capacity due from October 2037. The connection agreement is held by Ridge Clean Energy Ltd.
- Planning (current stage)
- Consented (not yet reached)
- Construction (not yet reached)
- OperatingFrom Oct 2037 (not yet reached)
- Closed (not yet reached)
Scoping and awaiting consents are both shown as planning. A connection agreement does not mean the project will be built: many queue projects never reach construction.
Connection details
- NESO project number
- PRO-006001
- Customer
- Ridge Clean Energy Ltd
- Technology
- Wind Onshore
- Total capacity
- 66 MW
- Change in this agreement
- +66 MW
- Capacity effective from
- 31 October 2037
- Connection site
- Holm Hill 132kV Substation
- Transmission owner
- SP Transmission (south Scotland)
- Connection type
- Direct connection to the transmission network
- NESO project status
- Scoping
- Connections reform gate
- Gate 1
Connection site
The connection site could not be placed on the map.
Source: NESO Transmission Entry Capacity (TEC) register, downloaded 8 November 2026. Contains data from NESO, licensed under the NESO Open Data Licence. Report a problem