Grid infrastructure βΊ Connection queue βΊ Battery storage
BATTERY STORAGE Β· SPTSouth Street BESS
South Street BESS is a 63 MW battery storage project in planning, connecting to the SP Transmission (south Scotland) network at Partrick GSP, with capacity due from June 2031. The connection agreement is held by South Street BESS Limited.
Project stageIn planning
- Planning (current stage)
- Consented (not yet reached)
- Construction (not yet reached)
- OperatingFrom Jun 2031 (not yet reached)
- Closed (not yet reached)
Scoping and awaiting consents are both shown as planning. A connection agreement does not mean the project will be built: many queue projects never reach construction.
Connection details
- NESO project number
- PRO-004924
- Customer
- South Street BESS Limited
- Technology
- Energy Storage System
- Total capacity
- 63 MW
- Change in this agreement
- +63 MW
- Capacity effective from
- 30 June 2031
- Connection site
- Partrick GSP
- Transmission owner
- SP Transmission (south Scotland)
- Connection type
- Embedded (connects through the local distribution network)
- NESO project status
- Scoping
- Connections reform gate
- Gate 1
Connection site
The connection site could not be placed on the map.
Source: NESO Transmission Entry Capacity (TEC) register, downloaded 8 November 2026. Contains data from NESO, licensed under the NESO Open Data Licence. Report a problem