ONSHORE WIND · SPTKnockcronal Wind Farm
Knockcronal Wind Farm is a 59 MW onshore wind project in planning, connecting to the SP Transmission (south Scotland) network at Knockcronal Wind Farm 33kV Substation, with capacity due from October 2029. The connection agreement is held by Knockcronal Wind Farm Limited.
- Planning (current stage)
- Consented (not yet reached)
- Construction (not yet reached)
- OperatingFrom Oct 2029 (not yet reached)
- Closed (not yet reached)
Scoping and awaiting consents are both shown as planning. A connection agreement does not mean the project will be built: many queue projects never reach construction.
Connection details
- NESO project number
- PRO-001801
- Customer
- Knockcronal Wind Farm Limited
- Technology
- Wind Onshore
- Total capacity
- 59 MW
- Change in this agreement
- +59 MW
- Capacity effective from
- 30 October 2029
- Connection site
- Knockcronal Wind Farm 33kV Substation
- Transmission owner
- SP Transmission (south Scotland)
- Connection type
- Direct connection to the transmission network
- NESO project status
- Awaiting Consents
Connection site
The connection site could not be placed on the map.
Source: NESO Transmission Entry Capacity (TEC) register, downloaded 8 November 2026. Contains data from NESO, licensed under the NESO Open Data Licence. Report a problem