Grid infrastructure β€Ί Connection queue β€Ί Solar + storage

SOLAR + STORAGE Β· SPT

Outh Muir Energy Park

Outh Muir Energy Park is a 60 MW solar + storage project in planning, connecting to the SP Transmission (south Scotland) network at Dunfermline 132/33kV, with capacity due from April 2028. The connection agreement is held by Grupotec Solar UK 4 Ltd.

Project stageIn planning
  1. Planning (current stage)
  2. Consented (not yet reached)
  3. Construction (not yet reached)
  4. OperatingFrom Apr 2028 (not yet reached)
  5. Closed (not yet reached)

Scoping and awaiting consents are both shown as planning. A connection agreement does not mean the project will be built: many queue projects never reach construction.

Connection details

NESO project number
PRO-002456
Customer
Grupotec Solar UK 4 Ltd
Technology
Energy Storage System, PV Array (Photo Voltaic/solar)
Total capacity
60 MW
Change in this agreement
+60 MW
Capacity effective from
12 April 2028
Connection site
Dunfermline 132/33kV
Transmission owner
SP Transmission (south Scotland)
Connection type
Embedded (connects through the local distribution network)
NESO project status
Scoping

Connection site

The marker shows the connection substation, not the project itself, with the transmission network around it.

Projects connecting near Dunfermline Β· Grid map

Source: NESO Transmission Entry Capacity (TEC) register, downloaded 8 November 2026. Contains data from NESO, licensed under the NESO Open Data Licence. Report a problem