🔌 EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more → Skip to main content

Grid infrastructure › Connection queue › Onshore wind

ONSHORE WIND · SPT

D&G 2

D&G 2 is a 60 MW onshore wind project in planning, connecting to the SP Transmission (south Scotland) network at Ladyburn 132/33Kv Grid Supply Point Substation, with capacity due from August 2031. The connection agreement is held by Greyland Energy Park Limited.

Project stageIn planning
  1. Planning (current stage)
  2. Consented (not yet reached)
  3. Construction (not yet reached)
  4. OperatingFrom Aug 2031 (not yet reached)
  5. Closed (not yet reached)

Scoping and awaiting consents are both shown as planning. A connection agreement does not mean the project will be built: many queue projects never reach construction.

Connection details

NESO project number
PRO-004772
Customer
Greyland Energy Park Limited
Technology
Wind Onshore
Total capacity
60 MW
Change in this agreement
+60 MW
Capacity effective from
29 August 2031
Connection site
Ladyburn 132/33Kv Grid Supply Point Substation
Transmission owner
SP Transmission (south Scotland)
Connection type
Embedded (connects through the local distribution network)
NESO project status
Scoping
Connections reform gate
Gate 1

Connection site

The marker shows the place the connection site is named after, not the project itself, with the transmission network around it.

Projects connecting near Ladyburn · Grid map

Source: NESO Transmission Entry Capacity (TEC) register, downloaded 8 November 2026. Contains data from NESO, licensed under the NESO Open Data Licence. Report a problem