WIND + STORAGE Β· SPT

Touch Energy Park

Touch Energy Park is a 60 MW wind + storage project in planning, connecting to the SP Transmission (south Scotland) network at Stirling 132/33kV, with capacity due from January 2029. The connection agreement is held by Naturalis Energy Developments Ltd.

Project stageIn planning
  1. Planning (current stage)
  2. Consented (not yet reached)
  3. Construction (not yet reached)
  4. OperatingFrom Jan 2029 (not yet reached)
  5. Closed (not yet reached)

Scoping and awaiting consents are both shown as planning. A connection agreement does not mean the project will be built: many queue projects never reach construction.

Connection details

NESO project number
PRO-001816
Customer
Naturalis Energy Developments Ltd
Technology
Energy Storage System, Wind Onshore
Total capacity
60 MW
Change in this agreement
+60 MW
Capacity effective from
31 January 2029
Connection site
Stirling 132/33kV
Transmission owner
SP Transmission (south Scotland)
Connection type
Embedded (connects through the local distribution network)
NESO project status
Scoping

Connection site

The marker shows the connection substation, not the project itself, with the transmission network around it.

Projects connecting near Stirling Β· Grid map

Source: NESO Transmission Entry Capacity (TEC) register, downloaded 8 November 2026. Contains data from NESO, licensed under the NESO Open Data Licence. Report a problem