Grid infrastructure βΊ Connection queue βΊ Wind + storage
WIND + STORAGE Β· SPTScaw Law Wind Farm
Scaw Law Wind Farm is a 60 MW wind + storage project in planning, connecting to the SP Transmission (south Scotland) network at Scaw Law 132kV substation, with capacity due from October 2036. The connection agreement is held by Perigus Energy UK Limited.
- Planning (current stage)
- Consented (not yet reached)
- Construction (not yet reached)
- OperatingFrom Oct 2036 (not yet reached)
- Closed (not yet reached)
Scoping and awaiting consents are both shown as planning. A connection agreement does not mean the project will be built: many queue projects never reach construction.
Connection details
- NESO project number
- PRO-004174
- Customer
- Perigus Energy UK Limited
- Technology
- Energy Storage System, Wind Onshore
- Total capacity
- 60 MW
- Change in this agreement
- +60 MW
- Capacity effective from
- 31 October 2036
- Connection site
- Scaw Law 132kV substation
- Transmission owner
- SP Transmission (south Scotland)
- Connection type
- Direct connection to the transmission network
- NESO project status
- Scoping
Connection site
The connection site could not be placed on the map.
Source: NESO Transmission Entry Capacity (TEC) register, downloaded 8 November 2026. Contains data from NESO, licensed under the NESO Open Data Licence. Report a problem