Cloud Hill Windfarm is a 60 MW wind + storage project in planning, connecting to the SP Transmission (south Scotland) network at Glenglass 132/33kV, with capacity due from October 2036. The connection agreement is held by Cloud Hill Windfarm Limited.

Project stageIn planning
  1. Planning (current stage)
  2. Consented (not yet reached)
  3. Construction (not yet reached)
  4. OperatingFrom Oct 2036 (not yet reached)
  5. Closed (not yet reached)

Scoping and awaiting consents are both shown as planning. A connection agreement does not mean the project will be built: many queue projects never reach construction.

Connection details

NESO project number
PRO-001938-2
Customer
Cloud Hill Windfarm Limited
Technology
Energy Storage System, Wind Onshore
Total capacity
60 MW
Change in this agreement
+10 MW
Capacity effective from
31 October 2036
Connection site
Glenglass 132/33kV
Transmission owner
SP Transmission (south Scotland)
Connection type
Direct connection to the transmission network
NESO project status
Scoping

Connection site

The marker shows the connection substation, not the project itself, with the transmission network around it.

Projects connecting near Glenglass Β· Grid map

Other projects at Glenglass 132/33kV

Source: NESO Transmission Entry Capacity (TEC) register, downloaded 8 November 2026. Contains data from NESO, licensed under the NESO Open Data Licence. Report a problem