Grid infrastructure › Connection queue › Wind + storage
WIND + STORAGE · SPTHeathland Wind Farm
Heathland Wind Farm is a 80 MW wind + storage project in planning, connecting to the SP Transmission (south Scotland) network at Heathland 132/33kV Substation, with capacity due from September 2028. The connection agreement is held by Edf Energy Renewables Limited.
- Planning (current stage)
- Consented (not yet reached)
- Construction (not yet reached)
- OperatingFrom Sep 2028 (not yet reached)
- Closed (not yet reached)
Scoping and awaiting consents are both shown as planning. A connection agreement does not mean the project will be built: many queue projects never reach construction.
Connection details
- NESO project number
- PRO-001156
- Customer
- Edf Energy Renewables Limited
- Technology
- Energy Storage System, Wind Onshore
- Total capacity
- 80 MW
- Change in this agreement
- +80 MW
- Capacity effective from
- 29 September 2028
- Connection site
- Heathland 132/33kV Substation
- Transmission owner
- SP Transmission (south Scotland)
- Connection type
- Direct connection to the transmission network
- NESO project status
- Scoping
Connection site
The connection site could not be placed on the map.
Source: NESO Transmission Entry Capacity (TEC) register, downloaded 8 November 2026. Contains data from NESO, licensed under the NESO Open Data Licence. Report a problem