SOLAR Β· SPTAGS Calderside PV Solar
AGS Calderside PV Solar is a 63 MW solar project in planning, connecting to the SP Transmission (south Scotland) network at Clydesmill 275/33kV, with capacity due from May 2027. The connection agreement is held by Advance Grid Solutions Limited.
Project stageIn planning
- Planning (current stage)
- Consented (not yet reached)
- Construction (not yet reached)
- OperatingFrom May 2027 (not yet reached)
- Closed (not yet reached)
Scoping and awaiting consents are both shown as planning. A connection agreement does not mean the project will be built: many queue projects never reach construction.
Connection details
- NESO project number
- PRO-004225
- Customer
- Advance Grid Solutions Limited
- Technology
- PV Array (Photo Voltaic/solar)
- Total capacity
- 63 MW
- Change in this agreement
- +63 MW
- Capacity effective from
- 31 May 2027
- Connection site
- Clydesmill 275/33kV
- Transmission owner
- SP Transmission (south Scotland)
- Connection type
- Embedded (connects through the local distribution network)
- NESO project status
- Scoping
Connection site
The connection site could not be placed on the map.
Other projects at Clydesmill 275/33kV
Source: NESO Transmission Entry Capacity (TEC) register, downloaded 8 November 2026. Contains data from NESO, licensed under the NESO Open Data Licence. Report a problem