Grid infrastructure βΊ Connection queue βΊ Battery storage
BATTERY STORAGE Β· SPTAitkenhead Farm BESS
Aitkenhead Farm BESS is a 300 MW battery storage project in planning, connecting to the SP Transmission (south Scotland) network at Clydesmill 275/33kV, with capacity due from April 2033. The connection agreement is held by Aitkenhead Storage Facility Limited.
- Planning (current stage)
- Consented (not yet reached)
- Construction (not yet reached)
- OperatingFrom Apr 2033 (not yet reached)
- Closed (not yet reached)
Scoping and awaiting consents are both shown as planning. A connection agreement does not mean the project will be built: many queue projects never reach construction.
Connection details
- NESO project number
- PRO-002585
- Customer
- Aitkenhead Storage Facility Limited
- Technology
- Demand, Energy Storage System
- Total capacity
- 300 MW
- Change in this agreement
- +300 MW
- Capacity effective from
- 30 April 2033
- Connection site
- Clydesmill 275/33kV
- Transmission owner
- SP Transmission (south Scotland)
- Connection type
- Direct connection to the transmission network
- NESO project status
- Scoping
- Connections reform gate
- Gate 1
Connection site
The connection site could not be placed on the map.
Other projects at Clydesmill 275/33kV
Source: NESO Transmission Entry Capacity (TEC) register, downloaded 8 November 2026. Contains data from NESO, licensed under the NESO Open Data Licence. Report a problem