Grid infrastructure › Connection queue › Onshore wind
ONSHORE WIND · SPTUpper Beoch Windfarm
Upper Beoch Windfarm is a 80 MW onshore wind project in planning, connecting to the SP Transmission (south Scotland) network at New Cumnock North 132kV Substation, with capacity due from July 2036. The connection agreement is held by Brockwell Energy Limited.
- Planning (current stage)
- Consented (not yet reached)
- Construction (not yet reached)
- OperatingFrom Jul 2036 (not yet reached)
- Closed (not yet reached)
Scoping and awaiting consents are both shown as planning. A connection agreement does not mean the project will be built: many queue projects never reach construction.
Connection details
- NESO project number
- PRO-004068
- Customer
- Brockwell Energy Limited
- Technology
- Wind Onshore
- Total capacity
- 80 MW
- Change in this agreement
- +80 MW
- Capacity effective from
- 31 July 2036
- Connection site
- New Cumnock North 132kV Substation
- Transmission owner
- SP Transmission (south Scotland)
- Connection type
- Direct connection to the transmission network
- NESO project status
- Scoping
- Connections reform gate
- Gate 1
Connection site
The marker shows the connection substation, not the project itself, with the transmission network around it.
Source: NESO Transmission Entry Capacity (TEC) register, downloaded 8 November 2026. Contains data from NESO, licensed under the NESO Open Data Licence. Report a problem