Projects
| Project | Capacity | Stage |
|---|---|---|
| CONTEGO Battery Storage Project Battery storage · Harmony CS Ltd |
36 MW | |
| Kemsley Gas · Grovehurst Energy Limited |
36 MW | |
| South Brook Solar + storage · JBM Solar Limited |
36 MW | Awaiting Consents |
| Wymondley BESS Limited Battery storage · Agr Renewables Limited |
36 MW | Awaiting Consents |
| Tale Lane Solar / A008 Langford Solar + storage · Jbm Solar Projects 2 Ltd |
35 MW | Scoping |
| Goole Fields Wind Farm Onshore wind · Rwe Renewables UK Swindon Limited |
32 MW | |
| Barrow Battery storage · New Energy Partnership Limited |
30 MW | Scoping |
| Beech Street/City Road Gas · Citigen (London) Limited |
30 MW | |
| Care North Tawton BEGA Battery storage · Care Power (North Tawton) Limited |
30 MW | |
| Maentwrog Hydro and pumped storage · Nuclear Decommissioning Authority |
30 MW | |
| Rayleigh GP3 Battery storage · Enso Green Holdings J Limited |
30 MW | Scoping |
| Redditch Gas · Cinergy Global Power (UK) Limited |
29 MW | |
| Creyke Beck Battery 2 Battery storage · Cbb Spv Limited |
29 MW | Consents Approved |
| Norwich 2 Solar · Edf Energy Renewables Limited |
28 MW | Scoping |
| Plymouth Main Gas · Viridis 178 Limited |
26 MW | |
| Blackpool BESS Battery storage · Conrad (Blackpool) Limited |
25 MW | |
| Peak Gen Southampton Gas · W4B Renewable Energy Limited |
24 MW | |
| Conrad (Torquay) Limited Battery storage · Conrad (Torquay) Limited |
22 MW | |
| Dowlais Gas · Viridis 178 Limited |
21 MW | |
| Green Frog @ Goose House Lane Gas · Viridis 178 Limited |
21 MW | |
| Green Frog @ Moorfield Drive Gas · Viridis 178 Limited |
21 MW | |
| Green Frog @ Rake Lane Gas · Viridis 178 Limited |
21 MW | |
| Peak Gen Fareham Gas · Peak Gen Power 13 Limited |
21 MW | |
| Peak Gen Havant Gas · Peak Gen Power 18 Limited |
21 MW | |
| Peak Gen Llandarcy Gas · Peak Gen Power 5 Limited |
21 MW | |
| Barton Hill Gas · Viridis 178 Limited |
21 MW | |
| Redfield Road A Gas · Viridis 178 Limited |
21 MW | |
| Redfield Road B Gas · Viridis 178 Limited |
21 MW | |
| Water Lane Gas · Viridis 178 Limited |
21 MW | |
| Peak Gen BEGA Gas · Peak Gen Power 2 Limited |
21 MW | |
| Bispham BEGA Gas · Conrad (Bispham) Limited |
20 MW | |
| Chatterley Gas · Conrad (Chatterley) Limited |
20 MW | |
| Conrad (Basingstoke) Limited Battery storage · Conrad (Basingstoke) Limited |
20 MW | |
| Farnham BESS Battery storage · Harmony FM Limited |
20 MW | |
| Green Frog @ Down Barn Farm Gas · Viridis 178 Limited |
20 MW | |
| Hawkers Hill Energy Park Battery storage · Hawkers Hill Energy Park Limited |
20 MW | |
| Lister Drive Battery storage · Orsted Ess Mersey Limited |
20 MW | |
| Middlewich BEGA Gas · Conrad (Middlewich) Limited |
20 MW | |
| Peak Gen Barry Battery storage · Peak Gen Power 6 Limited |
20 MW | |
| Peak Gen Bracknell Gas · Peak Gen Power 11 Limited |
20 MW | |
| Peak Gen Makro Exeter Other · Peak Gen Power 14 Limited |
20 MW | |
| Conrad (Swindon) Limited Battery storage · Conrad (Swindon) Limited |
19 MW | |
| Conrad (Winchester) Limited Battery storage · Conrad (Winchester) Limited |
19 MW | |
| Plymouth Rock Gas · Viridis 178 Limited |
15 MW | |
| Glanford Other · Epr Glanford Limited |
15 MW | |
| Green Frog @ Letchworth Gas · Viridis 178 Limited |
15 MW | |
| Trafalgar Park Gas · Viridis 178 Limited |
14 MW | |
| Feckenham Greener Grid Park Battery storage · Statkraft UK Ltd |
12 MW | Scoping |
| Green Frog at Lester Way Gas · Viridis 178 Limited |
12 MW | |
| Swansea Greener Grid Park - Connection 1 Battery storage · Swansea Grid Solutions Limited |
12 MW | Under Construction/Commissioning |
Sources: NESO Transmission Entry Capacity (TEC) register and interconnector register (downloaded 8 November 2026); NESO Clean Power 2030 network map (existing and planned circuits, substations and network projects); National Grid Electricity Transmission overhead line routes. Contains data from NESO, licensed under the NESO Open Data Licence, and National Grid open data. Projects are placed at their connection substation, not the generating site; projects at new, unnamed “connection nodes” are listed but not mapped.