πŸ”Œ EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more β†’ Skip to main content

Grid infrastructure β€Ί Connection queue β€Ί Gas

GAS Β· NGET

Dowlais

Dowlais is a 21 MW gas project built and connected, connecting to the National Grid (England & Wales) network at Upperboat 132kV Substation. The connection agreement is held by Viridis 178 Limited.

Project stageOperating
  1. Planning (completed)
  2. Consented (completed)
  3. Construction (completed)
  4. Operating (current stage)
  5. Closed (not yet reached)

Connection details

NESO project number
PRO-000948
Customer
Viridis 178 Limited
Technology
Thermal
Total capacity
21 MW
Already connected
21 MW
Connection site
Upperboat 132kV Substation
Transmission owner
National Grid (England & Wales)
Connection type
Embedded (connects through the local distribution network)
NESO project status
Built

Connection site

The connection site could not be placed on the map.

Projects connecting near Upperboat Β· Grid map

Other projects at Upperboat 132kV Substation

Source: NESO Transmission Entry Capacity (TEC) register, downloaded 8 November 2026. Contains data from NESO, licensed under the NESO Open Data Licence. Report a problem