Grid infrastructure β€Ί Connection queue β€Ί Battery storage

BATTERY STORAGE Β· NGET

Conrad (Torquay) Limited

Conrad (Torquay) Limited is a 22 MW battery storage project built and connected, connecting to the National Grid (England & Wales) network at Abham GSP. The connection agreement is held by Conrad (Torquay) Limited.

Project stageOperating
  1. Planning (completed)
  2. Consented (completed)
  3. Construction (completed)
  4. Operating (current stage)
  5. Closed (not yet reached)

Connection details

NESO project number
PRO-004386
Customer
Conrad (Torquay) Limited
Technology
Energy Storage System
Total capacity
22 MW
Already connected
22 MW
Connection site
Abham GSP
Transmission owner
National Grid (England & Wales)
Connection type
Embedded (connects through the local distribution network)
NESO project status
Built

Connection site

The marker shows the connection substation, not the project itself, with the transmission network around it.

Projects connecting near Abham GSP Β· Grid map

Other projects at Abham GSP

Source: NESO Transmission Entry Capacity (TEC) register, downloaded 8 November 2026. Contains data from NESO, licensed under the NESO Open Data Licence. Report a problem