Grid infrastructure βΊ Connection queue βΊ Gas
GAS Β· NGETPeak Gen Llandarcy
Peak Gen Llandarcy is a 21 MW gas project built and connected, connecting to the National Grid (England & Wales) network at Swansea North 400kV Substation. The connection agreement is held by Peak Gen Power 5 Limited.
Connection details
- NESO project number
- PRO-003900
- Customer
- Peak Gen Power 5 Limited
- Technology
- Gas Reciprocating
- Total capacity
- 21 MW
- Already connected
- 21 MW
- Connection site
- Swansea North 400kV Substation
- Transmission owner
- National Grid (England & Wales)
- Connection type
- Embedded (connects through the local distribution network)
- NESO project status
- Built
Connection site
The marker shows the connection substation, not the project itself, with the transmission network around it.
Other projects at Swansea North 400kV Substation
- Swansea North Green Energy CentreSolar + storage Β· 1.0 GW Β· Scoping
- SwanseaSolar + storage Β· 400 MW Β· Scoping
- Swansea North Green Energy CentreSolar + storage Β· 400 MW Β· Scoping
- Hirfynydd and Mynydd DrumaurSolar + storage Β· 249 MW Β· Scoping
- Hirfynydd and Mynydd DrumaurSolar + storage Β· 230 MW Β· Scoping
- BESS SwanBattery storage Β· 200 MW Β· Scoping
- Swansea Greener Grid Park - Connection 1Battery storage Β· 97 MW Β· Scoping
- Swansea NorthBattery storage Β· 50 MW Β· Scoping
- Swansea Greener Grid Park - Connection 1Battery storage Β· 12 MW Β· Under Construction/Commissioning
- Swansea Greener Grid Park - Connection 2Other Β· 0 MW Β· Consents Approved
Source: NESO Transmission Entry Capacity (TEC) register, downloaded 8 November 2026. Contains data from NESO, licensed under the NESO Open Data Licence. Report a problem