Grid infrastructure βΊ Connection queue βΊ Battery storage
BATTERY STORAGE Β· NGETSwansea North
Swansea North is a 50 MW battery storage project in planning, connecting to the National Grid (England & Wales) network at Swansea North 400kV Substation, with capacity due from July 2028. The connection agreement is held by Edf Energy Renewables Limited.
- Planning (current stage)
- Consented (not yet reached)
- Construction (not yet reached)
- OperatingFrom Jul 2028 (not yet reached)
- Closed (not yet reached)
Scoping and awaiting consents are both shown as planning. A connection agreement does not mean the project will be built: many queue projects never reach construction.
Connection details
- NESO project number
- PRO-001119
- Customer
- Edf Energy Renewables Limited
- Technology
- Energy Storage System
- Total capacity
- 50 MW
- Change in this agreement
- +50 MW
- Capacity effective from
- 31 July 2028
- Connection site
- Swansea North 400kV Substation
- Transmission owner
- National Grid (England & Wales)
- Connection type
- Direct connection to the transmission network
- NESO project status
- Scoping
- Connections reform gate
- Gate 1
Connection site
The marker shows the connection substation, not the project itself, with the transmission network around it.
Other projects at Swansea North 400kV Substation
- Swansea North Green Energy CentreSolar + storage Β· 1.0 GW Β· Scoping
- SwanseaSolar + storage Β· 400 MW Β· Scoping
- Swansea North Green Energy CentreSolar + storage Β· 400 MW Β· Scoping
- Hirfynydd and Mynydd DrumaurSolar + storage Β· 249 MW Β· Scoping
- Hirfynydd and Mynydd DrumaurSolar + storage Β· 230 MW Β· Scoping
- BESS SwanBattery storage Β· 200 MW Β· Scoping
- Swansea Greener Grid Park - Connection 1Battery storage Β· 97 MW Β· Scoping
- Peak Gen LlandarcyGas Β· 21 MW Β· Built
- Swansea Greener Grid Park - Connection 1Battery storage Β· 12 MW Β· Under Construction/Commissioning
- Swansea Greener Grid Park - Connection 2Other Β· 0 MW Β· Consents Approved
Source: NESO Transmission Entry Capacity (TEC) register, downloaded 8 November 2026. Contains data from NESO, licensed under the NESO Open Data Licence. Report a problem