Grid infrastructure › Connection queue › Battery storage
BATTERY STORAGE · NGETCreyke Beck Battery 2
Creyke Beck Battery 2 is a 29 MW battery storage project consented, connecting to the National Grid (England & Wales) network at Creyke Beck 400kV Substation, with capacity due from June 2028. The connection agreement is held by Cbb Spv Limited.
Project stageConsented
- Planning (completed)
- Consented (current stage)
- Construction (not yet reached)
- OperatingFrom Jun 2028 (not yet reached)
- Closed (not yet reached)
Connection details
- NESO project number
- PRO-004060
- Customer
- Cbb Spv Limited
- Technology
- Energy Storage System
- Total capacity
- 29 MW
- Change in this agreement
- +29 MW
- Capacity effective from
- 30 June 2028
- Connection site
- Creyke Beck 400kV Substation
- Transmission owner
- National Grid (England & Wales)
- Connection type
- Direct connection to the transmission network
- NESO project status
- Consents Approved
Connection site
The marker shows the connection substation, not the project itself, with the transmission network around it.
Other projects at Creyke Beck 400kV Substation
- Bute Hydrogen Project 2Gas · 3.6 GW · Scoping
- Hornsea Power Station 4Offshore wind · 2.6 GW · Scoping
- Hornsea Power Station 4Offshore wind · 1.5 GW · Scoping
- Flinton RoadSolar + storage · 600 MW · Scoping
- Creyke BeckSolar + storage · 500 MW · Scoping
- Creyke Beck PV & BESS SubSolar + storage · 250 MW · Scoping
Source: NESO Transmission Entry Capacity (TEC) register, downloaded 8 November 2026. Contains data from NESO, licensed under the NESO Open Data Licence. Report a problem