Grid infrastructure βΊ Connection queue βΊ Solar + storage
SOLAR + STORAGE Β· NGETCreyke Beck
Creyke Beck is a 500 MW solar + storage project in planning, connecting to the National Grid (England & Wales) network at Creyke Beck 400kV Substation, with capacity due from May 2033. The connection agreement is held by Clean Air Renewables Limited.
- Planning (current stage)
- Consented (not yet reached)
- Construction (not yet reached)
- OperatingFrom May 2033 (not yet reached)
- Closed (not yet reached)
Scoping and awaiting consents are both shown as planning. A connection agreement does not mean the project will be built: many queue projects never reach construction.
Connection details
- NESO project number
- PRO-001972
- Customer
- Clean Air Renewables Limited
- Technology
- Energy Storage System, PV Array (Photo Voltaic/solar)
- Total capacity
- 500 MW
- Change in this agreement
- +500 MW
- Capacity effective from
- 31 May 2033
- Connection site
- Creyke Beck 400kV Substation
- Transmission owner
- National Grid (England & Wales)
- Connection type
- Direct connection to the transmission network
- NESO project status
- Scoping
Connection site
The marker shows the connection substation, not the project itself, with the transmission network around it.
Other projects at Creyke Beck 400kV Substation
- Bute Hydrogen Project 2Gas Β· 3.6 GW Β· Scoping
- Hornsea Power Station 4Offshore wind Β· 2.6 GW Β· Scoping
- Hornsea Power Station 4Offshore wind Β· 1.5 GW Β· Scoping
- Flinton RoadSolar + storage Β· 600 MW Β· Scoping
- Creyke Beck PV & BESS SubSolar + storage Β· 250 MW Β· Scoping
- Creyke Beck Battery 2Battery storage Β· 29 MW Β· Consents Approved
Source: NESO Transmission Entry Capacity (TEC) register, downloaded 8 November 2026. Contains data from NESO, licensed under the NESO Open Data Licence. Report a problem