🔌 EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more → Skip to main content

Grid infrastructure › Connection queue › Solar + storage

SOLAR + STORAGE · NGET

Creyke Beck PV & BESS Sub

Creyke Beck PV & BESS Sub is a 250 MW solar + storage project in planning, connecting to the National Grid (England & Wales) network at Creyke Beck 400kV Substation, with capacity due from May 2035. The connection agreement is held by Beferleah Energy Park Limited.

Project stageIn planning
  1. Planning (current stage)
  2. Consented (not yet reached)
  3. Construction (not yet reached)
  4. OperatingFrom May 2035 (not yet reached)
  5. Closed (not yet reached)

Scoping and awaiting consents are both shown as planning. A connection agreement does not mean the project will be built: many queue projects never reach construction.

Connection details

NESO project number
PRO-002672
Customer
Beferleah Energy Park Limited
Technology
Energy Storage System, PV Array (Photo Voltaic/solar)
Total capacity
250 MW
Change in this agreement
+250 MW
Capacity effective from
30 May 2035
Connection site
Creyke Beck 400kV Substation
Transmission owner
National Grid (England & Wales)
Connection type
Direct connection to the transmission network
NESO project status
Scoping

Connection site

The marker shows the connection substation, not the project itself, with the transmission network around it.

Projects connecting near Creyke Beck · Grid map

Other projects at Creyke Beck 400kV Substation

Source: NESO Transmission Entry Capacity (TEC) register, downloaded 8 November 2026. Contains data from NESO, licensed under the NESO Open Data Licence. Report a problem