Grid infrastructure β€Ί Connection queue β€Ί Gas

GAS Β· NGET

Redditch

Redditch is a 29 MW gas project built and connected, connecting to the National Grid (England & Wales) network at Feckenham GSP. The connection agreement is held by Cinergy Global Power (UK) Limited.

Project stageOperating
  1. Planning (completed)
  2. Consented (completed)
  3. Construction (completed)
  4. Operating (current stage)
  5. Closed (not yet reached)

Connection details

NESO project number
PRO-000198
Customer
Cinergy Global Power (UK) Limited
Technology
CCGT (Combined Cycle Gas Turbine)
Total capacity
29 MW
Already connected
29 MW
Connection site
Feckenham GSP
Transmission owner
National Grid (England & Wales)
Connection type
Embedded (connects through the local distribution network)
NESO project status
Built

Connection site

The marker shows the connection substation, not the project itself, with the transmission network around it.

Projects connecting near Feckenham GSP Β· Grid map

Source: NESO Transmission Entry Capacity (TEC) register, downloaded 8 November 2026. Contains data from NESO, licensed under the NESO Open Data Licence. Report a problem