Grid infrastructure βΊ Connection queue βΊ Solar
SOLAR Β· NGETNorwich 2
Norwich 2 is a 28 MW solar project in planning, connecting to the National Grid (England & Wales) network at Norwich Main 400kV Substation, with capacity due from June 2033. The connection agreement is held by Edf Energy Renewables Limited.
- Planning (current stage)
- Consented (not yet reached)
- Construction (not yet reached)
- OperatingFrom Jun 2033 (not yet reached)
- Closed (not yet reached)
Scoping and awaiting consents are both shown as planning. A connection agreement does not mean the project will be built: many queue projects never reach construction.
Connection details
- NESO project number
- PRO-002408
- Customer
- Edf Energy Renewables Limited
- Technology
- PV Array (Photo Voltaic/solar), Wind Onshore
- Total capacity
- 28 MW
- Change in this agreement
- +28 MW
- Capacity effective from
- 30 June 2033
- Connection site
- Norwich Main 400kV Substation
- Transmission owner
- National Grid (England & Wales)
- Connection type
- Direct connection to the transmission network
- NESO project status
- Scoping
- Connections reform gate
- Gate 1
Connection site
The marker shows the connection substation, not the project itself, with the transmission network around it.
Other projects at Norwich Main 400kV Substation
- Hornsea Power Station 3Offshore wind Β· 3.0 GW Β· Consents Approved
- Hornsea Power Station 3Offshore wind Β· 2.3 GW Β· Consents Approved
- Scira-Dudgeon ExtensionOffshore wind Β· 1.4 GW Β· Scoping
- Scira-Dudgeon ExtensionOffshore wind Β· 950 MW Β· Scoping
- Scira-Dudgeon ExtensionOffshore wind Β· 719 MW Β· Scoping
- NorwichSolar + storage Β· 57 MW Β· Consents Approved
Source: NESO Transmission Entry Capacity (TEC) register, downloaded 8 November 2026. Contains data from NESO, licensed under the NESO Open Data Licence. Report a problem