Green Frog @ Moorfield Drive

Green Frog @ Moorfield Drive is a 21 MW gas project built and connected, connecting to the National Grid (England & Wales) network at Padiham 132kV Substation. The connection agreement is held by Viridis 178 Limited.

Project stageOperating
  1. Planning (completed)
  2. Consented (completed)
  3. Construction (completed)
  4. Operating (current stage)
  5. Closed (not yet reached)

Connection details

NESO project number
PRO-001313
Customer
Viridis 178 Limited
Technology
CCGT (Combined Cycle Gas Turbine)
Total capacity
21 MW
Already connected
21 MW
Connection site
Padiham 132kV Substation
Transmission owner
National Grid (England & Wales)
Connection type
Embedded (connects through the local distribution network)
NESO project status
Built

Connection site

The marker shows the connection substation, not the project itself, with the transmission network around it.

Projects connecting near Padiham Β· Grid map

Source: NESO Transmission Entry Capacity (TEC) register, downloaded 8 November 2026. Contains data from NESO, licensed under the NESO Open Data Licence. Report a problem