Grid infrastructure β€Ί Connection queue β€Ί Battery storage

BATTERY STORAGE Β· NGET

Care North Tawton BEGA

Care North Tawton BEGA is a 30 MW battery storage project built and connected, connecting to the National Grid (England & Wales) network at Alverdiscott GSP. The connection agreement is held by Care Power (North Tawton) Limited.

Project stageOperating
  1. Planning (completed)
  2. Consented (completed)
  3. Construction (completed)
  4. Operating (current stage)
  5. Closed (not yet reached)

Connection details

NESO project number
PRO-006838
Customer
Care Power (North Tawton) Limited
Technology
Energy Storage System
Total capacity
30 MW
Already connected
30 MW
Connection site
Alverdiscott GSP
Transmission owner
National Grid (England & Wales)
Connection type
Embedded (connects through the local distribution network)
NESO project status
Built

Connection site

The marker shows the connection substation, not the project itself, with the transmission network around it.

Projects connecting near Alverdiscott GSP Β· Grid map

Source: NESO Transmission Entry Capacity (TEC) register, downloaded 8 November 2026. Contains data from NESO, licensed under the NESO Open Data Licence. Report a problem