Grid infrastructure β€Ί Connection queue β€Ί Gas

GAS Β· NGET

Peak Gen BEGA

Peak Gen BEGA is a 21 MW gas project built and connected, connecting to the National Grid (England & Wales) network at Walpole 132kV Substation. The connection agreement is held by Peak Gen Power 2 Limited.

Project stageOperating
  1. Planning (completed)
  2. Consented (completed)
  3. Construction (completed)
  4. Operating (current stage)
  5. Closed (not yet reached)

Connection details

NESO project number
PRO-001302
Customer
Peak Gen Power 2 Limited
Technology
Oil & AGT (Advanced Gas Turbine)
Total capacity
21 MW
Already connected
21 MW
Connection site
Walpole 132kV Substation
Transmission owner
National Grid (England & Wales)
Connection type
Embedded (connects through the local distribution network)
NESO project status
Built

Connection site

The marker shows the connection substation, not the project itself, with the transmission network around it.

Projects connecting near Walpole Β· Grid map

Other projects at Walpole 132kV Substation

Source: NESO Transmission Entry Capacity (TEC) register, downloaded 8 November 2026. Contains data from NESO, licensed under the NESO Open Data Licence. Report a problem