Grid infrastructure βΊ Connection queue βΊ Gas
GAS Β· NGETPeak Gen BEGA
Peak Gen BEGA is a 21 MW gas project built and connected, connecting to the National Grid (England & Wales) network at Walpole 132kV Substation. The connection agreement is held by Peak Gen Power 2 Limited.
Connection details
- NESO project number
- PRO-001302
- Customer
- Peak Gen Power 2 Limited
- Technology
- Oil & AGT (Advanced Gas Turbine)
- Total capacity
- 21 MW
- Already connected
- 21 MW
- Connection site
- Walpole 132kV Substation
- Transmission owner
- National Grid (England & Wales)
- Connection type
- Embedded (connects through the local distribution network)
- NESO project status
- Built
Connection site
The marker shows the connection substation, not the project itself, with the transmission network around it.
Other projects at Walpole 132kV Substation
Source: NESO Transmission Entry Capacity (TEC) register, downloaded 8 November 2026. Contains data from NESO, licensed under the NESO Open Data Licence. Report a problem