Peak Gen Fareham

Peak Gen Fareham is a 21 MW gas project built and connected, connecting to the National Grid (England & Wales) network at Nursling 132kV Substation. The connection agreement is held by Peak Gen Power 13 Limited.

Project stageOperating
  1. Planning (completed)
  2. Consented (completed)
  3. Construction (completed)
  4. Operating (current stage)
  5. Closed (not yet reached)

Connection details

NESO project number
PRO-003901
Customer
Peak Gen Power 13 Limited
Technology
Gas Reciprocating
Total capacity
21 MW
Already connected
21 MW
Connection site
Nursling 132kV Substation
Transmission owner
National Grid (England & Wales)
Connection type
Embedded (connects through the local distribution network)
NESO project status
Built

Connection site

The marker shows the connection substation, not the project itself, with the transmission network around it.

Projects connecting near Nursling Β· Grid map

Source: NESO Transmission Entry Capacity (TEC) register, downloaded 8 November 2026. Contains data from NESO, licensed under the NESO Open Data Licence. Report a problem