Grid infrastructure β€Ί Connection queue β€Ί Battery storage

BATTERY STORAGE Β· NGET

Blackpool BESS

Blackpool BESS is a 25 MW battery storage project built and connected, connecting to the National Grid (England & Wales) network at Bispham Primary 33kV Substation. The connection agreement is held by Conrad (Blackpool) Limited.

Project stageOperating
  1. Planning (completed)
  2. Consented (completed)
  3. Construction (completed)
  4. Operating (current stage)
  5. Closed (not yet reached)

Connection details

NESO project number
PRO-003080
Customer
Conrad (Blackpool) Limited
Technology
Energy Storage System
Total capacity
25 MW
Already connected
25 MW
Connection site
Bispham Primary 33kV Substation
Transmission owner
National Grid (England & Wales)
Connection type
Embedded (connects through the local distribution network)
NESO project status
Built

Connection site

The connection site could not be placed on the map.

Projects connecting near Bispham Primary Β· Grid map

Source: NESO Transmission Entry Capacity (TEC) register, downloaded 8 November 2026. Contains data from NESO, licensed under the NESO Open Data Licence. Report a problem