United States › Grid › Interconnection queues
OCTARY USA · INTERCONNECTION QUEUESWithdrawn queue requests in ERCOT (Texas) (2014 requests)
Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.
Map
Requests
| Project | Capacity | Status |
|---|---|---|
| Rockwood G Gas · Lincoln Clean |
1,122 MW | Withdrawn / abandoned |
| Shawnee G Gas · Lincoln Clean |
928 MW | Withdrawn / abandoned |
| Eagle Mountain SES Gas · Luminant |
853 MW | Withdrawn / abandoned |
| Site C Brazos G Gas · Brazos Elec Coop |
800 MW | Withdrawn / abandoned |
| Union Valley G Gas · Quantum |
592 MW | Withdrawn / abandoned |
| Clear Springs G Gas · Quantum |
592 MW | Withdrawn / abandoned |
| Van Alstyne G Gas · Navasota |
548 MW | Withdrawn / abandoned |
| Halyard Henderson Gas · Halyard Energy |
484 MW | Withdrawn / abandoned |
| Lake Creek 3 G Gas · Luminant |
471 MW | Withdrawn / abandoned |
| Tradinghouse G Gas · Luminant |
471 MW | Withdrawn / abandoned |
| Pullman Road Wind Onshore wind · SunEdison |
300 MW | Withdrawn / abandoned |
| Pumpkin Farm Wind Onshore wind · Apex Clean |
281 MW | Withdrawn / abandoned |
| Pecan Creek 1 Gas Gas · NTE Energy |
280 MW | Withdrawn / abandoned |
| RE Maplewood 2c Solar Solar · Recurrent Energy |
250 MW | Withdrawn / abandoned |
| San Roman Wind 2 Onshore wind · Pioneer Green |
201 MW | Withdrawn / abandoned |
| Red River Saltfork W Onshore wind · Chermac |
201 MW | Withdrawn / abandoned |
| Watusi Wind, LLC Onshore wind · NextEra Energy Resources |
201 MW | Withdrawn / abandoned |
| WIT Ranch Wind Onshore wind · Eon |
200 MW | Withdrawn / abandoned |
| Buffalo Wind 2 Onshore wind · National Renewable Solutions |
199 MW | Withdrawn / abandoned |
| Horseshoe Bend S Solar · Luminant |
150 MW | Withdrawn / abandoned |
| Solar Prime TX-10 Solar · Solar Prime |
150 MW | Withdrawn / abandoned |
| King Mt II Solar · Nextera |
150 MW | Withdrawn / abandoned |
| Clear Water Solar Solar · Hilliard Energy |
150 MW | Withdrawn / abandoned |
| Chocolate Bayou Wind Onshore wind · Engie |
150 MW | Withdrawn / abandoned |
| TXP Ricebird Gas · TXP Holdings |
142 MW | Withdrawn / abandoned |
| Barilla Solar 3 Solar · First Solar |
140 MW | Withdrawn / abandoned |
| Bosque Upgrade Gas · Calpine |
124 MW | Withdrawn / abandoned |
| SP-TX-08 Solar · Solar Prime |
120 MW | Withdrawn / abandoned |
| RE Avalon Solar Solar · Recurrent Energy |
105 MW | Withdrawn / abandoned |
| BNB Lamesa Solar 2 Solar · BNB |
100 MW | Withdrawn / abandoned |
| Braford Wind Onshore wind · Nextera |
100 MW | Withdrawn / abandoned |
| RE Maplewood 2e Solar Solar · Recurrent Energy |
100 MW | Withdrawn / abandoned |
| RE Monument Solar Solar · Recurrent Energy |
100 MW | Withdrawn / abandoned |
| New Falcon Wind Onshore wind · Nextera |
100 MW | Withdrawn / abandoned |
| Jobe Solar Solar · Sun Power |
100 MW | Withdrawn / abandoned |
| Locust Solar Solar · SunEdison |
100 MW | Withdrawn / abandoned |
| Dogwood Solar Solar · SunEdison |
100 MW | Withdrawn / abandoned |
| Briscoe Solar Solar · Juwi Solar |
100 MW | Withdrawn / abandoned |
| Caballo Solar Solar · Recurrent Energy |
100 MW | Withdrawn / abandoned |
| RE Maplewood 2d Solar Solar · Recurrent Energy |
100 MW | Withdrawn / abandoned |
| RE Palmwood 1 Solar Solar · Recurrent Energy |
98.0 MW | Withdrawn / abandoned |
| Parker Ranch Solar 1 Solar · SunPower |
88.0 MW | Withdrawn / abandoned |
| Corpus Christi Upgrade Gas · Calpine |
82.0 MW | Withdrawn / abandoned |
| Mason Mt Wind Onshore wind · Enel Green |
62.0 MW | Withdrawn / abandoned |
| Parker Ranch Solar 2 Solar · SunPower |
56.0 MW | Withdrawn / abandoned |
| M&G Resins Corpus Christi Gas · M&G Resins USA, LLC |
51.0 MW | Withdrawn / abandoned |
| BThorn Solar · SunEdison |
50.0 MW | Withdrawn / abandoned |
| SolaireHolman 2 Solar · Solaire Direct |
50.0 MW | Withdrawn / abandoned |
| SP-TX-09 Solar · Solar Prime |
45.0 MW | Withdrawn / abandoned |
| Castle Gap Solar 2 Solar · Solar Prime |
30.0 MW | Withdrawn / abandoned |
Capacity in the queue by state
Click a state to drill down.
By grid region
ISO/RTO markets and the non-ISO West and Southeast.
- MISO (Midcontinent)77 · 22.8 GW
- PJM (Mid-Atlantic, Midwest)126 · 12.4 GW
- ERCOT (Texas)52 · 12.1 GW
- CAISO (California)70 · 10.2 GW
- West (non-ISO utilities)151 · 9,551 MW
- SPP (Southwest Power Pool)56 · 8,704 MW
- Southeast (non-ISO utilities)76 · 6,064 MW
- ISO-NE (New England)28 · 4,881 MW
- NYISO (New York)30 · 1,581 MW
Requests by year joined
Capacity of requests in this view, by the year they entered the queue. Click a year.
Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines · Planned power plants (EIA)