GAS Β· ERCOT

Pecan Creek 1 Gas

Pecan Creek 1 Gas is a 280 MW gas request withdrawn in the ERCOT interconnection queue.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Feb 2014 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
16INR0036
Grid region
ERCOT (Texas)
Developer
NTE Energy
Connection point (POI)
tap 345kV 11420 Sweetwater - 11406 Central Bluff
Technology
Gas: 280 MW
Total requested
280 MW
Study phase
FIS
Queue status
Withdrawn
Entered queue
19 February 2014
Proposed online date
April 2019

Location

No county location in the queue data.

Power plants in Β· Transmission lines in

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem