Buffalo Wind 2

Buffalo Wind 2 is a 199 MW onshore wind request withdrawn in the ERCOT interconnection queue.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Jan 2014 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
15INR0071
Grid region
ERCOT (Texas)
Developer
National Renewable Solutions
Technology
Wind: 199 MW
Total requested
199 MW
Study phase
FIS
Queue status
Withdrawn
Entered queue
7 January 2014
Proposed online date
March 2017

Location

No county location in the queue data.

Power plants in Β· Transmission lines in

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem