RE Maplewood 2c Solar

RE Maplewood 2c Solar is a 250 MW solar request withdrawn in the ERCOT interconnection queue, in Pecos County, Texas.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Oct 2014 (completed)
  2. Withdrawn / abandonedAug 2020 (project stopped here)
  3. ConsentedMay 2019 (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
17INR0020c
Grid region
ERCOT (Texas)
Developer
Recurrent Energy
Connection point (POI)
76002 Bakersfield 345kV
Location
Pecos County, Texas
Technology
Solar: 250 MW
Total requested
250 MW
Study phase
IA
Queue status
Withdrawn
Entered queue
16 October 2014
Agreement signed
6 May 2019
Proposed online date
December 2021
Withdrawn
August 2020

Location

Marker shows the centre of Pecos County; the queue data does not give exact sites.

Power plants in Texas Β· Transmission lines in Texas

Other requests in Pecos County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem