United States βΊ Grid βΊ Interconnection queues
ONSHORE WIND Β· ERCOTPullman Road Wind
Pullman Road Wind is a 300 MW onshore wind request withdrawn in the ERCOT interconnection queue.
Queue statusWithdrawn / abandoned
- PlanningQueued Feb 2014 (completed)
- Withdrawn / abandoned (project stopped here)
- ConsentedMay 2014 (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 15INR0079
- Grid region
- ERCOT (Texas)
- Developer
- SunEdison
- Connection point (POI)
- 79500 Alibates 345kV
- Technology
- Wind: 300 MW
- Total requested
- 300 MW
- Study phase
- IA and FIS Pending
- Queue status
- Withdrawn
- Entered queue
- 25 February 2014
- Agreement signed
- 29 May 2014
- Proposed online date
- October 2019
Location
No county location in the queue data.
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem