SOLAR Β· ERCOTHorseshoe Bend S
Horseshoe Bend S is a 150 MW solar request withdrawn in the ERCOT interconnection queue.
Queue statusWithdrawn / abandoned
- PlanningQueued Sep 2014 (completed)
- Withdrawn / abandoned (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 16INR0066
- Grid region
- ERCOT (Texas)
- Developer
- Luminant
- Connection point (POI)
- tap Morgan (1030) - Gasconades (76030) 345kV
- Technology
- Solar: 150 MW
- Total requested
- 150 MW
- Study phase
- FIS Complete
- Queue status
- Withdrawn
- Entered queue
- 30 September 2014
- Proposed online date
- December 2017