Clear Water Solar

Clear Water Solar is a 150 MW solar request withdrawn in the ERCOT interconnection queue.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Nov 2014 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
16INR0070
Grid region
ERCOT (Texas)
Developer
Hilliard Energy
Connection point (POI)
Wink 138 kV bus (#1074)
Technology
Solar: 150 MW
Total requested
150 MW
Study phase
FIS
Queue status
Withdrawn
Entered queue
5 November 2014
Proposed online date
December 2016

Location

No county location in the queue data.

Power plants in Β· Transmission lines in

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem