Chocolate Bayou Wind

Chocolate Bayou Wind is a 150 MW onshore wind request withdrawn in the ERCOT interconnection queue, in Brazoria County, Texas.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Dec 2014 (completed)
  2. Withdrawn / abandonedOct 2021 (project stopped here)
  3. ConsentedSep 2019 (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
16INR0074
Grid region
ERCOT (Texas)
Developer
Engie
Connection point (POI)
tap 138kV 42109 Hudson - 42960 Mustang
Location
Brazoria County, Texas
Technology
Wind: 150 MW
Total requested
150 MW
Study phase
IA and FIS Pending
Queue status
Withdrawn
Entered queue
7 December 2014
Agreement signed
26 September 2019
Proposed online date
May 2022
Withdrawn
October 2021

Location

Marker shows the centre of Brazoria County; the queue data does not give exact sites.

Power plants in Texas · Transmission lines in Texas

Other requests in Brazoria County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem