GAS Β· ERCOTClear Springs G
Clear Springs G is a 592 MW gas request withdrawn in the ERCOT interconnection queue.
Queue statusWithdrawn / abandoned
- PlanningQueued May 2014 (completed)
- Withdrawn / abandoned (project stopped here)
- ConsentedMay 2016 (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 17INR0017
- Grid region
- ERCOT (Texas)
- Developer
- Quantum
- Connection point (POI)
- 7050 Clear Springs 345kV
- Technology
- Gas: 592 MW
- Total requested
- 592 MW
- Study phase
- IA and FIS Pending
- Queue status
- Withdrawn
- Entered queue
- 21 May 2014
- Agreement signed
- 11 May 2016
- Proposed online date
- June 2019
Location
No county location in the queue data.
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem