πŸ”Œ EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more β†’ Skip to main content

United States β€Ί Grid β€Ί Interconnection queues

GAS Β· ERCOT

Clear Springs G

Clear Springs G is a 592 MW gas request withdrawn in the ERCOT interconnection queue.

Queue statusWithdrawn / abandoned
  1. PlanningQueued May 2014 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. ConsentedMay 2016 (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
17INR0017
Grid region
ERCOT (Texas)
Developer
Quantum
Connection point (POI)
7050 Clear Springs 345kV
Technology
Gas: 592 MW
Total requested
592 MW
Study phase
IA and FIS Pending
Queue status
Withdrawn
Entered queue
21 May 2014
Agreement signed
11 May 2016
Proposed online date
June 2019

Location

No county location in the queue data.

Power plants in Β· Transmission lines in

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem