GAS Β· ERCOT

Shawnee G

Shawnee G is a 928 MW gas request withdrawn in the ERCOT interconnection queue.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Jul 2014 (completed)
  2. Withdrawn / abandonedAug 2018 (project stopped here)
  3. ConsentedApr 2016 (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
18INR0004
Grid region
ERCOT (Texas)
Developer
Lincoln Clean
Connection point (POI)
68090 Sam Switch 345kV
Technology
Gas: 928 MW
Total requested
928 MW
Study phase
IA and FIS Pending
Queue status
Withdrawn
Entered queue
15 July 2014
Agreement signed
19 April 2016
Proposed online date
October 2019
Withdrawn
August 2018

Location

No county location in the queue data.

Power plants in Β· Transmission lines in

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem