ONSHORE WIND Β· ERCOT

San Roman Wind 2

San Roman Wind 2 is a 201 MW onshore wind request withdrawn in the ERCOT interconnection queue.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Dec 2014 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
16INR0078
Grid region
ERCOT (Texas)
Developer
Pioneer Green
Connection point (POI)
tap near Palmito 345kV (5966)
Technology
Wind: 201 MW
Total requested
201 MW
Study phase
FIS
Queue status
Withdrawn
Entered queue
22 December 2014
Proposed online date
October 2016

Location

No county location in the queue data.

Power plants in Β· Transmission lines in

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem