United States › Grid › Interconnection queues › California
OCTARY USA · INTERCONNECTION QUEUESInterconnection queue in California — page 9
Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.
Map
Requests
| Project | Capacity | Status |
|---|---|---|
| Montezuma (High Winds III) Wind + storage |
76.0 MW | Agreement signed |
| Palmetto Energy Storage Battery storage |
75.6 MW | In study |
| Hummingbird Energy Storage Battery storage |
75.0 MW | Agreement signed |
| Battery storage project GI-2023-178, Imperial County Battery storage |
75.0 MW | In study |
| Battery storage project Q62, Los Angeles County Battery storage |
75.0 MW | In study |
| Battery storage project GI-2021-146, Imperial County Battery storage |
75.0 MW | In study |
| Willow Springs Solar 4 Battery storage |
75.0 MW | Agreement signed |
| Solar + storage project GI-2021-147, Imperial County Solar + storage |
75.0 MW | In study |
| Rosemary Solar + storage |
72.3 MW | Agreement signed |
| Tarragon Hybrid Solar + storage |
71.9 MW | In study |
| Hammerhead Storage Battery storage |
71.3 MW | In study |
| Fallbrook Energy Storage Battery storage |
69.6 MW | Agreement signed |
| Off Stream Water Storage Battery storage |
68.9 MW | In study |
| Solar + storage project GI-2022-157, Imperial County Solar + storage |
65.0 MW | In study |
| Box Solar |
63.4 MW | In study |
| Little Hill Battery storage |
63.1 MW | In study |
| Mulqueeney Ranch Wind 2 Onshore wind |
62.5 MW | Agreement signed |
| Angela Solar + storage |
60.0 MW | Agreement signed |
| Battery storage project GI-2022-161, Imperial County Battery storage |
60.0 MW | In study |
| Prospect Energy Storage Battery storage |
58.8 MW | Paused / redesign |
| Camino Solar Solar + storage |
58.3 MW | Agreement signed |
| Bottle Rock Power Other |
56.9 MW | Agreement signed |
| Mayacamas Geothermal Geothermal |
53.0 MW | In study |
| Scafell Storage Battery storage |
52.0 MW | In study |
| Geranium Energy Storage Battery storage |
51.4 MW | In study |
| Orleans Solar + storage |
51.1 MW | Agreement signed |
| Ventasso Energy Storage Battery storage |
50.8 MW | Agreement signed |
| Township Power Bank Battery storage |
50.5 MW | In study |
| Verbena Energy Storage Battery storage |
50.5 MW | In study |
| Solar + storage project GI-2022-160, Imperial County Solar + storage |
50.0 MW | In study |
| Willow Springs Solar 3 Battery storage |
50.0 MW | Agreement signed |
| Kifer BESS 1 Battery storage |
50.0 MW | In study |
| Solar + storage project GI-2023-165, Imperial County Solar + storage |
50.0 MW | In study |
| Solar Star 4 Solar + storage |
50.0 MW | Agreement signed |
| Geothermal project GI-2020-130, Imperial County Geothermal |
50.0 MW | In study |
| North Johnson Energy Center Battery storage |
50.0 MW | Agreement signed |
| Chula Vista Energy Center 2 Battery storage |
50.0 MW | Agreement signed |
| Solar + storage project GI-2022-159, Imperial County Solar + storage |
50.0 MW | In study |
| Solar Star 3 Solar + storage |
50.0 MW | Agreement signed |
| Air Station 1 Solar + storage |
42.1 MW | In study |
| Little Bear 3 Solar + storage |
40.4 MW | Agreement signed |
| Rio Bravo Solar 1 Solar + storage |
40.0 MW | Agreement signed |
| Kettleman Solar Project (Fka Kettleman Solar Farm) Solar + storage |
40.0 MW | Agreement signed |
| Little Bear Solar 1 Solar + storage |
40.0 MW | Agreement signed |
| Little Bear Solar 2 Solar + storage |
40.0 MW | Agreement signed |
| Rio Bravo Solar 2 Solar + storage |
40.0 MW | Agreement signed |
| Pumpjack Solar I (Aka Pioneer Solar I) Solar + storage |
40.0 MW | Agreement signed |
| Crow Creek Solar 1 (Fka: Frontier Solar 1) (Fka As Scatec Westside Solar Ranch I And Stanislaus PV - Phase 1) Solar + storage |
40.0 MW | Agreement signed |
| Solar + storage project GI-2023-172, Imperial County Solar + storage |
39.2 MW | In study |
| Starlight Solar Solar + storage |
37.4 MW | Agreement signed |
Capacity in the queue by state
Click a state to drill down.
By grid region
ISO/RTO markets and the non-ISO West and Southeast.
Requests by year joined
Capacity of requests in this view, by the year they entered the queue. Click a year.
Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines · Planned power plants (EIA)