OTHER · CAISOBottle Rock Power
Bottle Rock Power is a 56.9 MW other request with a signed interconnection agreement in the CAISO interconnection queue, in Lake County, California, connecting to PGAE.
Queue statusConsented
- PlanningQueued Sep 2005 (completed)
- ConsentedNov 2006 (current stage)
- Construction (not yet reached)
- OperatingOct 2007 (not yet reached)
- Closed (not yet reached)
Request details
- Queue ID
- 81
- Grid region
- CAISO (California)
- Utility / transmission owner
- PGAE
- Connection point (POI)
- Geysers #17-Fulton 230 kV Line
- Location
- Lake County, California
- Technology
- Geothermal: 9.4 MW · Battery: 47.4 MW
- Total requested
- 56.9 MW
- Service type
- Energy only (ERIS)
- Study phase
- Executed
- Queue status
- Active
- Entered queue
- 13 September 2005
- Agreement signed
- 16 November 2006
- Proposed online date
- November 2027
- Came online
- October 2007
Location
Marker shows the centre of Lake County; the queue data does not give exact sites.
Power plants in California · Transmission lines in California
Other requests in Lake County
- West Ford Flat Energy StorageBattery storage · 26.3 MW · built
- Bear Canyon Energy StorageBattery storage · 13.3 MW · built
- Geysers Wind ProjectOnshore wind · 201 MW · withdrawn
- Walker RidgeOnshore wind · 145 MW · withdrawn
- Walker Ridge Wind Energy ParkOnshore wind · 66.2 MW · withdrawn
- Binkley Power ProjectGeothermal · 50.0 MW · withdrawn
- Scenic Energy StorageBattery storage · 40.4 MW · withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem