ONSHORE WIND · CAISO

Walker Ridge Wind Energy Park

Walker Ridge Wind Energy Park is a 66.2 MW onshore wind request withdrawn in the CAISO interconnection queue, in Lake County, California, connecting to PGAE.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Jul 2007 (completed)
  2. Withdrawn / abandonedJun 2013 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
250
Grid region
CAISO (California)
Utility / transmission owner
PGAE
Connection point (POI)
Redbud-Cortina 115kV line
Location
Lake County, California
Technology
Wind: 66.2 MW
Total requested
66.2 MW
Service type
Network resource (NRIS)
Study phase
System Impact Study
Queue status
Withdrawn
Entered queue
30 July 2007
Proposed online date
August 2014
Withdrawn
June 2013

Location

Marker shows the centre of Lake County; the queue data does not give exact sites.

Power plants in California · Transmission lines in California

Other requests in Lake County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem